EX-01

Working

Excavator · Caterpillar 390F (2019) · 8,866 h · Scroggie Creek

Last seen 13:23:33

Digital twin
Live machine view
Work cycle, load, fuel and lamps follow live telemetry. Drag to rotate, scroll to zoom.
Working
Assignment
Feeding WP-1
Operator Helder Ribeiro

Wash plant

s-scr-wp1

Hours today

5.2 h

Cycle time

32s

Cycles today

439

Engine hours

8,866 h

Next service

in 309 h

Telemetry
Live readings

Engine speed

1,741rpm

Coolant

91.3°C

Hydraulic oil

74.9°C

Hydraulic pressure

327bar

Bucket fill

93%

Fuel burn

59.9L/h
Fuel
Tank level
41%

407 L

In tank

59.9 L/h

Burn

6.8 h

Range

Utilisation
Hours on this shift

5.2 h

of a 12 h shift · 43% utilisation

Load

93%

Engine speed

1,741 rpm

Coolant

91 °C

Per hour
Utilisation and fuel burned today
Production day starts at 07:00.

Utilisation · %

Fuel · L

Alarms
Alarms (0)

No alarms on this unit in the last 48 hours.

Engine history
Engine speed, coolant and fuel level

Engine speed · rpm

Coolant · °C

Fuel level · %