EX-01

Working

Excavator · Caterpillar 390F (2019) · 8,866 h · Scroggie Creek

Last seen 13:33:11

Digital twin
Live machine view
Work cycle, load, fuel and lamps follow live telemetry. Drag to rotate, scroll to zoom.
Working
Assignment
Feeding WP-1
Operator Helder Ribeiro

Wash plant

s-scr-wp1

Hours today

5.4 h

Cycle time

32s

Cycles today

456

Engine hours

8,866 h

Next service

in 309 h

Telemetry
Live readings

Engine speed

1,735rpm

Coolant

91.1°C

Hydraulic oil

74.5°C

Hydraulic pressure

325bar

Bucket fill

91%

Fuel burn

59.6L/h
Fuel
Tank level
40%

397 L

In tank

59.6 L/h

Burn

6.7 h

Range

Utilisation
Hours on this shift

5.4 h

of a 12 h shift · 45% utilisation

Load

91%

Engine speed

1,735 rpm

Coolant

91 °C

Per hour
Utilisation and fuel burned today
Production day starts at 07:00.

Utilisation · %

Fuel · L

Alarms
Alarms (0)

No alarms on this unit in the last 48 hours.

Engine history
Engine speed, coolant and fuel level

Engine speed · rpm

Coolant · °C

Fuel level · %